Kalpataru Avana Plans

Browse through our various floor-plan configurations for the home that’s just right for you.

Kalpataru Avana Amenities

Kalpataru Avana Parel has every convenience you need to live a life of luxury and excellence.

Kids Play Area
Representational image#
Kalpataru avana kids play area
Rock Climbing Wall
Representational image#
Kalpataru avana rock climbing wall
Party Hall & Landscaped Terrace
Representational image#
Kalpataru avana party hall and landscaped terrace

External

Synthetic grass lawn for multi-sport activities Jogging/walking pathway Rock climbing wall Maze garden Fitness area Kids’ play area Rooftop gymnasium Party hall and landscaped terrace

Synthetic grass lawn for multi-sport activities Jogging/walking pathway Rock climbing wall Maze garden Fitness area Kids’ play area Rooftop gymnasium Party hall and landscaped terrace

Synthetic grass lawn for multi-sport activities Jogging/walking pathway Rock climbing wall Maze garden Fitness area Kids’ play area Rooftop gymnasium Party hall and landscaped terrace

temperature-controlled pool
Representational image#
Kalpataru avana swimming pool
Exotic spa and showers
Representational image#
Kalpataru avana massage room
Squash court
Representational image#
Kalpataru avana indoor games

Clubhouse

Well-appointed clubhouse Ozonated and temperature-controlled swimming pool and kids’ pool with deck Open air jacuzzi and splash pad Exotic spa and showers Squash court and indoor games room

Well-appointed clubhouse Ozonated and temperature-controlled swimming pool and kids’ pool with deck Open air jacuzzi and splash pad Exotic spa and showers Squash court and indoor games room

Well-appointed clubhouse Ozonated and temperature-controlled swimming pool and kids’ pool with deck Open air jacuzzi and splash pad Exotic spa and showers Squash court and indoor games room

living and dining
Shot on location 09/16^
Kalpataru avana living room
living and dining
Shot on location 09/16^
Kalpataru avana living room area
Engineered wooden flooring
Shot on location 09/16^
Avana wooden floors

Internal

Imported marble flooring adorning the living and dining area Engineered wooden flooring in bedrooms Well-planned kitchen with quartz-based agglomerate marble flooring, platforms and dado Imported marble/designer tiles in bathrooms Glass partitions in all bathrooms Rain shower with body jet spray and TV point in master bathroom

Imported marble flooring adorning the living and dining area Engineered wooden flooring in bedrooms Well-planned kitchen with quartz-based agglomerate marble flooring, platforms and dado Imported marble/designer tiles in bathrooms Glass partitions in all bathrooms Rain shower with body jet spray and TV point in master bathroom

Imported marble flooring adorning the living and dining area Engineered wooden flooring in bedrooms Well-planned kitchen with quartz-based agglomerate marble flooring, platforms and dado Imported marble/designer tiles in bathrooms Glass partitions in all bathrooms Rain shower with body jet spray and TV point in master bathroom

Kalpataru Avana Project Update

These are the latest images from the project-site. We look forward to the opportunity to take you through a live walk-through

Tower A (April 2019)
RCC work completed 100%.
Waterproofing completed up to 42nd floor excluding hold flats.
Plumbing work completed up to 42nd floor excluding hold flats.

Tower A (April 2019)
Electrical wiring completed up to 39th floor excluding hold flats.
Elevators work is in progress.
Terrace WP & filling completed.

Tower A (April 2019)
Tiling flooring work completed up to 33rd floor and 40th floor WIP excluding hold flats.
Window installation completed up to 20th floor
Above floor installation is in progress
External Facade work & fins work in Progress.

Tower B (April 2019)
RCC work completed 100%.
Waterproofing completed up to 41st floor excluding hold flats.
Plumbing work completed up to 41st floor excluding hold flats.

Tower B (April 2019)
Tiling flooring work completed up to 36th floor excluding hold flats
Window installation completed up to 20th floor
Above floor installation is in progress
External Facade work & fins work in Progress

Tower B (April 2019)
Electrical wiring completed up to 36th floor excluding hold flats.
Elevators work is in progress.
Terrace WP & filling completed.

Clubhouse (April 2019)
Podium 7th level Landscaping work is in progress.

Swimming Pool (April 2019)
Podium Club House RCC work completed 100%.
Podium Club House Waterproofing completed.
Podium Plumbing work completed.

Swimming Pool (April 2019)
Podium Tiling flooring work in progress.
Club House Window Façade installation is in progress.

Parking (April 2019)
Ground to Podium 7th level external facade work in Progress.

Parking (April 2019)
Tower external Facade work & fins work in Progress.