Kalpataru Residency Plans

Browse through our various floor-plan configurations for the home that’s just right for you.

Kalpataru Residency Amenities

Life at Kalpataru Residency comes replete with world-class amenities and fabulous luxuries.

Garden
Artist Impression*
Kalpataru residency garden
Walking/jogging track
Artist Impression*
Residency jogging track
Kids’ play area
Artist Impression*
Residency kids play area

External

Cricket practice pitch Outdoor fitness area Kids’ play area with soft fall finishing Rock climbing wall for kids Yoga and meditation deck amidst lush green plantation Walking/jogging track Outdoor chess court

Cricket practice pitch Outdoor fitness area Kids’ play area with soft fall finishing Rock climbing wall for kids Yoga and meditation deck amidst lush green plantation Walking/jogging track Outdoor chess court

Cricket practice pitch Outdoor fitness area Kids’ play area with soft fall finishing Rock climbing wall for kids Yoga and meditation deck amidst lush green plantation Walking/jogging track Outdoor chess court

World-class gymnasium
Representational Image#
Kalpataru residency gymnasium
Table Tennis court
Representational Image#
Residency indoor badminton court

Clubhouse

World-class gymnasium and state-of-the-art equipment Relaxing spa with salon, massage and steam room Swimming pool with separate kids’ pool along with pool decks, changing rooms, showers, toilets etc. Indoor badminton court Indoor games room Yoga/aerobics room

World-class gymnasium and state-of-the-art equipment Relaxing spa with salon, massage and steam room Swimming pool with separate kids’ pool along with pool decks, changing rooms, showers, toilets etc. Indoor badminton court Indoor games room Yoga/aerobics room

Living room
Shot on location on 08/2016^
Residency_03
Living room
Shot on location on 08/2016^
Residency_04
Bedroom
Shot on location on 08/2016^
Kalpataru residency bedroom
Kitchen
Shot on location on 08/2016^
Kalpataru residency kitchen

Internal

Thoughtfully designed for ample natural light and cross ventilation Balconies with full-height French windows No common walls between most apartments ensuring privacy No two entrance doors facing each other

Thoughtfully designed for ample natural light and cross ventilation Balconies with full-height French windows No common walls between most apartments ensuring privacy No two entrance doors facing each other

Thoughtfully designed for ample natural light and cross ventilation Balconies with full-height French windows No common walls between most apartments ensuring privacy No two entrance doors facing each other

Thoughtfully designed for ample natural light and cross ventilation Balconies with full-height French windows No common walls between most apartments ensuring privacy No two entrance doors facing each other

Kalpataru Residency Project Update

These are the latest images from the project-site. We look forward to the opportunity to take you through a live walk-through

Towers A1 & A2 (March 2019)
A1 and A2- Rcc, Block Work and Railing Works Completed.
External primer work in Progress – external

Towers B1 & B2 (March 2019)
B1 and B2- RCC, Block Work and Railing Works Completed.
B1- External Painting WIP
B2 - External Primer work in Progress

Towers A3 & A4 (March 2019)
Terrace Water Proofing Completed
Railing Work & External Plaster Work In Progress

Towers B3 & B4 (March 2019)
B3 - Above Terrace WIP
B4 - 13th floor Slab Casting completed and External Plastering work in Progress

Central Podium Part - view (March 2019)
Water Proofing WIP

Club house (March 2019)
Club House RCC, Block Work, External Plastering Completed
Balcony Railing work completed
GYPSUM work in Progress

    

East Side Compound Wall (March 2019)
Blockwork completed (From North East Corner)
Coping work & Plastering in progress

South Side Compound Wall (March 2019)
Work in progress

Gypsum Works Progress (March 2019)
Tower A1-15th floor, Tower A2 - 15th Floor, Tower B1 - 15th floor, Tower B2 - 15th floor Completed

Gypsum Works Progress (March 2019)
Tower A3 - 15th floor WIP Tower A4 - 15th floor WIP Tower B3 - 11th floor WIP Tower B4 - 7th floor WIP

Ceiling Putty Progress (March 2019)
Tower A1 - 15th floor Tower A2 - 15th floor Tower B1 - 15th floor Tower B2 - 15th floor Completed

Ceiling Putty Progress (March 2019)
Tower A3- 15th WIP, Tower A4- 15th WIP, Tower B3- 8th floor, Tower B4 - 7th floor WIP

Flooring Activity (March 2019)
Tower A1 - 15th floor Completed
Tower A2 - 15th floor Completed
Tower B1 - 14th floor Tower B2 - 14th floor WIP

Flooring Activity (March 2019)
Tower A3 - 10th floor
Tower A4 - 10th floor Completed
Tower B3 - 2nd floor Completed

Windows (March 2019)
Tower A1 & A2 - 9th floor
Tower B1 - 8th floor
Tower B2 - 8th floor completed

Windows (March 2019)
Tower A1 & A2, Tower B1 & B2 - 15th floor work in progress

Windows (March 2019)
Tower A3 - 7th floor and Tower A4 - 7th floor work in progress

Door (March 2019)
Tower B1 & B2 - 13th floor WIP
A1- 15th floor WIP
Tower A2 - 15th floor WIP
Tower A3 - 10th floor WIP
Tower A4 - 10th floor WIP

Staircase Railing (March 2019)
Tower A1, A2, A3, & A4 and Tower B1 & B2 - 1st to 15th floor installation completed
Tower B3, Tower B4 - 9th Floor WIP

VDF works at Sub - Cellar Level (March 2019)
WIP - 7,813 SQM Completed

Rain Water Harvesting (March 2019)
Pits work for north side completed
East and south side along compound wall - WIP

Internal Putty Works (March 2019)
Towers A1 & A2 - WIP
Tower B1 - 9th floor, Tower B2 - 9th floor- WIP

Entrance gate & Security Cabin (March 2019)
Work in progress

Projection Slab (March 2019)
Paint mockup in progress

West Side Compound Wall (March 2019)
Work in progress