Kalpataru Residency Plans

Browse through our various floor-plan configurations for the home that’s just right for you.

Kalpataru Residency Amenities

Life at Kalpataru Residency comes replete with world-class amenities and fabulous luxuries.

Garden
Artist Impression*
Kalpataru residency garden
Walking/jogging track
Artist Impression*
Residency jogging track
Kids’ play area
Artist Impression*
Residency kids play area
External

Cricket practice pitch Outdoor fitness area Kids’ play area with soft fall finishing Rock climbing wall for kids Yoga and meditation deck amidst lush green plantation Walking/jogging track Outdoor chess court

Cricket practice pitch Outdoor fitness area Kids’ play area with soft fall finishing Rock climbing wall for kids Yoga and meditation deck amidst lush green plantation Walking/jogging track Outdoor chess court

Cricket practice pitch Outdoor fitness area Kids’ play area with soft fall finishing Rock climbing wall for kids Yoga and meditation deck amidst lush green plantation Walking/jogging track Outdoor chess court

World-class gymnasium
Representational Image#
Kalpataru residency gymnasium
Table Tennis court
Representational Image#
Residency indoor badminton court
Clubhouse

World-class gymnasium and state-of-the-art equipment Relaxing spa with salon, massage and steam room Swimming pool with separate kids’ pool along with pool decks, changing rooms, showers, toilets etc. Indoor badminton court Indoor games room Yoga/aerobics room

World-class gymnasium and state-of-the-art equipment Relaxing spa with salon, massage and steam room Swimming pool with separate kids’ pool along with pool decks, changing rooms, showers, toilets etc. Indoor badminton court Indoor games room Yoga/aerobics room

Living room
Shot on location on 08/2016^
Residency_03
Living room
Shot on location on 08/2016^
Residency_04
Bedroom
Shot on location on 08/2016^
Kalpataru residency bedroom
Kitchen
Shot on location on 08/2016^
Kalpataru residency kitchen
Internal

Thoughtfully designed for ample natural light and cross ventilation Balconies with full-height French windows No common walls between most apartments ensuring privacy No two entrance doors facing each other

Thoughtfully designed for ample natural light and cross ventilation Balconies with full-height French windows No common walls between most apartments ensuring privacy No two entrance doors facing each other

Thoughtfully designed for ample natural light and cross ventilation Balconies with full-height French windows No common walls between most apartments ensuring privacy No two entrance doors facing each other

Thoughtfully designed for ample natural light and cross ventilation Balconies with full-height French windows No common walls between most apartments ensuring privacy No two entrance doors facing each other

Kalpataru Residency Project Update

These are the latest images from the project-site. We look forward to the opportunity to take you through a live walk-through

Tower A1 (October 2018)
RCC AND BLOCK WORK COMPLETED, EXTERNAL PLASTERING IS IN PROGRESS, RAILING WORKS IN PROGRESS

Tower A2 (October 2018)
RCC AND BLOCK WORK COMPLETED, EXTERNAL PLASTERING IS IN PROGRESS, RAILING WORKS IN PROGRESS

Tower B1 (October 2018)
RCC AND BLOCK WORK COMPLETED, EXTERNAL PLASTERING IS IN PROGRESS, RAILING WORKS IN PROGRESS

Tower B2 (October 2018)
RCC AND BLOCK WORK COMPLETED, EXTERNAL PLASTERING IS IN PROGRESS, RAILING WORKS IN PROGRESS

Tower A3 (October 2018)
ABOVE TERRACE WIP

Tower A4 (October 2018)
15TH FLOOR CASTING COMPLETED RAILING WORKS IN PROGRESS

Tower B3 (October 2018)
11TH FLOOR Pour 1 CASTING COMPLETED

Tower B4 (October 2018)
6TH FLOOR CASTING COMPLETED

CLUB HOUSE (October 2018)
RCC COMPLETED, BLOCK WORK COMPLETED

CLUB HOUSE ( October 2018 )
RCC COMPLETED, BLOCK WORK COMPLETED

Compound Wall ( October 2018 )
East Side Compound Wall Blockwork completed (From North East Corner)

Compound Wall (October 2018)
East Side Compound Wall Blockwork completed (From North East Corner)

GYPSUM WORKS PROGRESS ( October 2018 )

CEILING PUTTY PROGRESS ( October 2018 )

FLOORING ACTIVITY ( October 2018 )
A1-10th, A2-8th, B1-9th, B2-8th, A3-5TH, A4-4TH FLOOR

FLOORING ACTIVITY (October 2018)
A1-10th, A2-8th, B1-9th, B2-8th, A3-5TH, A4-4TH FLOOR

WINDOWS (October 2018)
A1, A2, B1, B2 – 1ST - 4TH FLOOR COMPLETED A1, A2, B1, B2 – 10TH FLOOR WORK IN PROGRESS

WINDOWS ( October 2018 )
A1, A2, B1, B2 – 1ST - 4TH FLOOR COMPLETED A1, A2, B1, B2 – 10TH FLOOR WORK IN PROGRESS

DOOR ( October 2018 )
B1, B2- 5TH FLOOR WIP, A1,A2 – 5TH FLOOR WIP

DOOR (October 2018)
A3, A4 – 1ST FLOOR FRAMES FIXING COMPLETED

STAIRCASE RAILING (October 2018)
A1, B1 – 1ST TO 15TH FLOOR INSTALLATION COMPLETED

STAIRCASE RAILING ( October 2018 )
A1, B1 – 1ST TO 15TH FLOOR INSTALLATION COMPLETED