Launch Code Starlight At Kalpataru Parkcity Plans

Browse through our various floor-plan configurations for the home that’s just right for you.

Launch Code Starlight At Kalpataru Parkcity Amenities

Launch Code Starlight at Kalpataru Parkcity has all the conveniences that complete modern-day living

SWIMMING POOL WITH POOL DECK
Representative Image#
swimming-pool-with-pool-deck-new
Joggers track
Representative Image#
joggers-track-new
KIDS' PLAY AREA
Representative Image#
kids play area

External

Club facilities Swimming pool with pool decks Toddler's pool Poolside cabana Pool lounge Children's play area Maze garden Function hall Viewing Decks Safety & Security

Club facilities Swimming pool with pool decks Toddler's pool Poolside cabana Pool lounge Children's play area Maze garden Function hall Viewing Decks Safety & Security

Club facilities Swimming pool with pool decks Toddler's pool Poolside cabana Pool lounge Children's play area Maze garden Function hall Viewing Decks Safety & Security

POOL TABLE
Representative Image#
pool-table-new
Gym
Representative Image#
gym-new

Clubhouse

Lounge Pool table, Table Tennis, Carom, Foosball, chess Video games & entertainment room Dartboard Reception lounge Function hall Music room Children’s activity area

Lounge Pool table, Table Tennis, Carom, Foosball, chess Video games & entertainment room Dartboard Reception lounge Function hall Music room Children’s activity area

Living Room
Representative Image#
LIVING ROOM
Bedroom
Representative Image#
Bedroom
Kitchen
Representative Image#
Kitchen

Internal

Vitrified tile flooring adorning the apartment Laminate finished doors Gypsum finished Internal walls with low Volatile Organic Compound (VOC) paint Aluminium sliding window Video door phone and integrated intrusion alarm system Balcony with skid resistant tile flooring and MS railing*

Vitrified tile flooring adorning the apartment Laminate finished doors Gypsum finished Internal walls with low Volatile Organic Compound (VOC) paint Aluminium sliding window Video door phone and integrated intrusion alarm system Balcony with skid resistant tile flooring and MS railing*

Vitrified tile flooring adorning the apartment Laminate finished doors Gypsum finished Internal walls with low Volatile Organic Compound (VOC) paint Aluminium sliding window Video door phone and integrated intrusion alarm system Balcony with skid resistant tile flooring and MS railing*

Launch Code Starlight At Kalpataru Parkcity Project Update

These are the latest images from the project-site. We look forward to the opportunity to take you through a live walk-through

Tower C
(June 2020)
1. Excavation work completed
2. PCC & Plum work in progress

Tower D
(June 2020)
1. Excavation completed 100%
2. Tower raft cast Completed
3. B1 level slab cast Completed
4. B1 to LG level Column WIP.

Tower E
(June 2020)
1. Excavation work completed 100%
2. Tower Raft cast Completed
3. B1 Slab cast Completed

Tower F
(June 2020)
1. Excavation work completed 100%
2. Tower Raft cast Completed
3. B1 Level slab cast Completed
4. B1 to LG level Column WIP.
5. Non Tower B1 Slab WIP

Tower G
(June 2020)
1. Excavation work completed 100%
2. Raft Casting completed
3. B2 to B1 Level column WIP
4. Non Tower area retaining wall / B1 slab WIP